Pier Founding Verification
Booked directly with your private certifier or structural engineer once bored piers are drilled to the soil report founding depth.
- Lot, estate, soil classification (M / H1 / H2 / E / P) and structural drawing revision recorded
- 450 mm pier count, positions and founding depth into natural ground verified
- Reinforcing cages and starter bars confirmed where specified on the footing schedule
- Written certifier sign-off attached before slab pods close over piers
