What concrete costs on the Gold Coast

Generic directory sites quote anything from $60 to $280 a square metre without mentioning roadbase, bar chairs, pumps or short-load minimums. Here is realistic 2026 SEQ licensed market pricing and what is inside an OnlyCrete fixed quote.

Ballpark your job

Use this 2026 South East Queensland market guide to sanity-check your budget before requesting an itemised fixed quote. Everything you select carries straight into our quote form.

Why house slabs aren't priced per m²: AS 2870 soil class (M through E), bored pier count, beam depths and pump setup swing a slab by thousands. Send your engineering PDFs and Reece prices the complete lot fixed.

  • Includes excavation trim, compacted CBR roadbase, SL72/SL82 mesh on cover chairs, 32 MPa concrete, placement and saw-cut control joints
  • $2,500 minimum job charge applies on small pours (<25 m²) to cover batch-plant short-load fees, machine float and QBCC crew
  • QBCC-compliant contracts & capped deposits (max 5%-10% on regulated jobs over $3,300 - never 50% cash upfront)
  • Council crossover permits (GCCC RS-049, LCC, BCC, ICC) and channel drains are itemised cleanly where required

2026 SEQ range calculator

Pick a common size preset or adjust your spec below.

Site access & slope
2026 SEQ market guide (inc. GST)$6,500 to $9,750Typical around $8,000

2026 SEQ licensed supply & lay guide (32 MPa mix, roadbase & mesh on chairs). Council crossover permits & stormwater alterations itemised separately.

Lock in a fixed quote for this →Carries your size & finish straight into our quote form.

What moves the price

Seven site factors decide the real figure. Knowing them lets you compare any concreter's quote apples-for-apples.

  • Area, thickness & short loads

    Concrete is batched by the cubic metre, and plants charge short-load cartage under ~4 m³. A 125 mm caravan driveway or portal-frame shed slab uses 25% more concrete and heavier SL82 mesh than a standard 100 mm slab.

  • AS 2870 soil class & piers

    Reactive clay (M, H1, H2, E) requires deeper stiffening ribs, SL92 mesh and 450 mm bored piers into founding ground. Your geotechnical soil report and structural engineer set this specification.

  • Truck access vs line/boom pump

    If an 8-wheeler concrete agitator can back safely to the formwork, we chute directly. Tight side access, rear patios, steep blocks and all house slabs use a concrete pump.

  • Slope, steps & edge formwork

    Steep frontages (like Hinterland and Ormeau ridges), drop-edge beams, step-downs and curved borders take extra boxing labour and stiffer slump control.

  • Surface finish & grinding

    Directional broom or helicopter trowel is base cost. Washed exposed aggregate adds stone blend and wash-off crew; honed alfresco adds post-cure diamond grinding and penetrating sealer ($210-$290+/m² complete).

  • Demolition & spoil tipping

    Saw-cutting, excavating and tipping reinforced old concrete or tree-root clay is always shown as its own transparent line item on an OnlyCrete quote.

  • Council crossovers & drainage

    Street verge crossovers require council permits and steel/thickness profiles (such as GCCC RS-049), and driveways sloping toward garages require heavy-duty grates.

Questions about price

Straight answers before you commit to a site visit.

Why don't you publish a single flat rate per square metre?

Because two 45 m² driveways on the same street can differ by $3,000 once breakout, bobcat cut, line pumping and council crossovers are counted. We give you honest ranges above, then quote your exact block fixed with zero day-of extras.

What is included in an OnlyCrete fixed quote?

Trim excavation and compacted subbase, rigid formwork, steel mesh on cover chairs, vapour barrier where required, plant-batched concrete, pump where needed, finishing, saw-cut control joints and site clean-up. House slabs also include piers, AS 3660.1 termite protection and certifier inspections.

How much deposit do you ask for, and is the work covered by warranty?

We follow Queensland QBCC domestic building contract rules strictly: regulated residential jobs over $3,300 receive a written contract with statutory capped deposits (maximum 10% under $20,000, or 5% for $20,000 and above - never 50% cash upfront) and staged progress claims. Every pour is carried out under QBCC Concreting Licence 15593005 statutory workmanship standards, with Queensland Home Warranty cover where applicable on direct insurable residential work.

Do you have a minimum job charge?

Yes - $2,500 inc. GST minimum mobilisation for small standalone pours, because concrete batch plants charge short-load fees, plus excavator float and a licensed finishing crew take the same half-day setup as a larger pour.

How is a house slab priced?

Strictly off the structural engineer's slab plan and geotechnical soil report. Builders and owner-builders receive one fixed figure covering set-out, piers, pods, steel, termite, pump and inspections, with clear schedule rates for rock or spoil.

Do you charge for quotes?

Never. Send PDF plans, photos and rough measurements, or book a free site measure across our SEQ corridor.

Want the exact fixed figure for your block?

Send photos and rough measurements, or upload your engineering plans, and Reece will price it properly.

Call Text Get a quote